Bule Hora Water Supply Project

Water Supply Engineering

SABA Engineering PLC provided engineering consultancy and supervision services for the Bule Hora Water Supply Project a critical infrastructure initiative aimed at improving access to clean and reliable water for the growing population.

The project involved the development of a comprehensive water supply system, including production, transmission, storage, and distribution components. Designed to meet increasing demand, the system enhances service coverage, reliability, and long-term sustainability.

SABA Engineering ensured the project was delivered in line with technical standards, operational efficiency requirements, and environmental considerations.

Project Highlights

  • Production Capacity: 15,000 m³/day
  • Transmission Network: 60 km
  • Distribution Network: 150 km
  • Reservoirs: 3
  • Boreholes: 8

Scope of Services

  • Engineering consultancy and technical advisory
  • Design and planning of water supply systems
  • Construction supervision and quality assurance
  • Review of contractor methodologies and specifications
  • Contract administration and reporting

Country

Ethiopia

Year

2012

Client

Oromiya Bureau of Water, Minerals and Energy