SABA Engineering PLC provided engineering consultancy and supervision services for the Bule Hora Water Supply Project a critical infrastructure initiative aimed at improving access to clean and reliable water for the growing population.
The project involved the development of a comprehensive water supply system, including production, transmission, storage, and distribution components. Designed to meet increasing demand, the system enhances service coverage, reliability, and long-term sustainability.
SABA Engineering ensured the project was delivered in line with technical standards, operational efficiency requirements, and environmental considerations.
